Sound
5 sound consoles 3 MIDAS XL 8 and 2 MIDAS Pro9210 speakers, Nexo Geo T and L-Acoustics dV-dosc
All speakers are managed through LAB LM 44 & LM 26
48 hand and headmics, all are Sennheiser 9000 series
16 In Ear system with 100 receivers, Sennheiser 2000 IEM
2 Macbook Pro machines running Waves plug-ins
2 Macbook Pro machines running Cubase
4 operators for PA & monitor
20 sound engineers to run the show
Stage
220 square metre specially made stage surface for performancesThe circumference of the centre Mainstage area is 38 metres
The perimeter of the stage is 207 metres
Each arch weighs 7 tons and measures 13 metres in height
The projection wall is 43 metres wide and 8 metres tall
Rigging
3500 metres of truss600 rigging points
159.6 tons rigged in the roof, the maximum capacity of the roof is 160 tons
40 km of signal & camera cables
50 km of power cables
Power Supply
6 Megawatt generator farm3.5 Megawatt generator power used per day
3000L Ecopar used per day
Pyrotechnics
32 Fireball machines24 Fireflame machines
6 Heavy smoke machines
4 Wind machines
3000 Pyro effects used during the show
100 kg Snow
100 kg Confetti
Lighting
1283 lighting fixtures800 moving lights
14 follow spots
4 weeks of virtual programming
4 weeks of live programming
2 lighting designers
4 lighting operators
12 grandMA II Light consoles, 6 live and 6 in back-up
24500 control channels
Video
28 Barco HDQ 40 projectors, the world’s largest video projector2 Barco HDF W26 projectors
4 Barco FLM HD20 projectors
4 Barco FLM R22+ projectors
8 Barco SLM R12 projectors
1 Barco Encore Image processing system
14 Green Hippo Hippotizer Media Servers
350 square meters 3D video mapping surface as a back-drop
1 media content designer
4 digital content designers
2 video operators
23 cameras to capture the action from all angles
2 multi camera directors
Other Facts
Equipment needed 95 transport trucks to deliver (25 stage only)6878 hotel nights
3 weeks for rigging all equipment
250 show crew
Inga kommentarer: